Huaneng Beijing Thermal Power Co., Ltd. 2017 Second Announcement of Bidding for Maintenance Projects of Gas-Steam Combined Cycle Units (Secondary Release)

Huaneng Beijing Thermal Power Co., Ltd. The second phase of the maintenance project for gas-steam combined cycle units in 2017 has already met the conditions for tendering. It intends to openly invite tenders for this project. A tender notice will be issued on October 30, 2016. By the deadline for registration, there will be less than three. The unit applies for bidding. According to the relevant provisions of the State Bidding Law, the tender notice for this project is now issued for the second time, and the applicant with the intention of bidding shall submit an application.

I. Project Overview
1. The tenderer profile:
Huaneng Beijing Thermal Power Co., Ltd. is the only grass-roots power company operated by China Huaneng Group in Beijing. It is the largest installed capacity and the largest heat-generating cogeneration enterprise in Beijing and has been identified as the southeast thermoelectric center of the capital by Beijing Municipality. Huaneng Beijing Thermal Power Co., Ltd. is located in the southeast of Beijing, within the Guanyintang Village of Wangsiying Township, Chaoyang District. The north side of the power plant is close to Guangqu Road and the north side of Guangqu Road. It is close to the Gaobeidian Wastewater Treatment Plant; It is Guanyintang Road; on the west is Gaobeidian Road; on the west side of Gaobeidian Road is Guanyintang Village; on the east side is adjacent to Beijing's East Fifth Ring Road. The geographical coordinates of the site are E 116°8'9′′, N 39°56'17′′.
2. Unit profile:
The second-phase gas turbine unit group of Huaneng Beijing Thermal Power Co., Ltd. is a “two-to-one” gas-steam combined cycle heating unit. Units 6 and 7 are gas turbines, and unit 8 is a steam turbine. The power generation output of Units 6 and 7 is 306.9MW. The power generation output of Unit 8 is 309.6MW. The total generating output of the unit group is 923.4MW. The overall configuration of the unit group is: 2 sets of Mitsubishi M701F4 type gas turbines, 2 gas turbine generators, 2 waste heat boilers, 1 heating steam turbine and 1 steam turbine generator; the fuel is natural gas.
3. Project Name: The second phase of the gas-steam combined cycle unit maintenance project in 2017.
Second, the scope of tender
The bidding scope of this project is the external maintenance project of Huaneng Beijing Thermal Power Co., Ltd. in the second phase of the 2017 gas-steam combined cycle unit.
Duration requirements: January 1, 2017 to December 31, 2017.
Third, the bid qualification requirements
1. The bidder has an independent legal personality. An independent legal entity legally registered within the territory of the People's Republic of China has the ability to independently bear civil liability, has the right to sign contracts independently and the registered capital is not less than 75 million yuan.
2. The bidder must have qualifications of Class 1 or above qualification for general contracting of power engineering construction or Class 1 or above qualification of general contractor for mechanical and electrical installation engineering (or have a first-class commitment for the installation (repair, test) power facility permit issued by the State Energy Regulatory Authority. Repair / installation qualification).
3. The bidder shall have a safety production license issued by the provincial construction authority or the safety production supervision authority, and shall be valid.
4. The bidder has not less than 3 items of infrastructure for 300MW or above thermal power generating units or 300MW or above thermal power generating units overhauled or main equipment maintenance performance for 300MW and above thermal power generating units (providing scans of performance contracts) in the past 3 years (2014-2016).
5. The bidder should have good bank credit and business reputation, not be ordered to suspend business or go bankrupt, and the assets have not been taken over, reorganized or frozen; economic litigation has not occurred in the past three years.
6. The bidder is not in the penalty period when the competent administrative department cancels the bid qualification. In the past, there was no bad record about the bid.
7. The bidder did not have bad records of the country, industry, China Huaneng Group Corporation and its subsidiaries.
8. Two or more legal persons, parent companies, wholly-owned subsidiaries and holding companies whose legal representative is the same person may not bid at the same time.
9. This tender does not accept bids in the form of consortium
2. Registration time: From 10:00 on November 8, 2016 to 10:00 on November 15, 2016.

Smart Mouse

Cixi Congfeng Fluorine Plastic Co.,Ltd , https://www.cfptfeseal.com