Skyworth box T1 how?

At the end of 2016, Skyworth Box ushered in a new member - Skyworth Box T1. Skyworth Box T1 is positioned on the ultra-high cost-effective model. On November 11th, it was launched with a half price of 99 yuan and a quota of 5,000 units. Are you ready? Shopping first to understand the product, Skyworth box T1 how? Let's take a look at the real machine of Skyworth box T1. Please refer to the follow-up introduction of deep trial evaluation.

Skyworth Box T1 Packaging Introduction


Skyworth box T1 packaging front

Skyworth Box T1 Package Side

Skyworth Box T1 Package Side

Skyworth Box T1 Outer Package Bottom

Skyworth box T1 packaging

Skyworth Box T1 Accessories Family Portrait
Skyworth box T1 packaging using kraft paper material, brown outsourcing is printed in the middle of the "Skybox T1" LOGO simple and clean. "Penguin TV" and "CIBN Internet TV Producer" are printed on the side of the outer package. It seems that the resources are quite rich! At the bottom, the relevant information of Skyworth Box T1 and the official WeChat QR code are introduced.

Skyworth Box T1 Body Design Process Introduction


Skyworth box T1 fuselage front

Skyworth Box T1 Body Interface

Skyworth box T1 side of the fuselage

Skyworth box T1 machine side angle

Skyworth box T1 machine side angle

Skyworth Box T1 bottom of the fuselage

Skyworth Box T1 bottom pad
Skyworth box T1 uses a pure white square shape design, rounded edges, white and light gray shapes and colors with a very fresh! Skyworth box T1 is printed with the "Skyworth" brand LOGO directly above the center, and the interface on the side of the body is set as the power interface, HDMI interface, NET interface, USB interface and AV interface. The bottom side of the box is made of gray plastic material, printed with relevant information about the product, and plastic feet are provided on the four corners.

Skyworth Box T1 Accessories Introduction


Skyworth box T1 remote control front

Skyworth Box T1 Remote Control Side

Skyworth Box T1 remote control indicator

Skyworth Box T1 remote control bottom

Skyworth Box T1 Remote Control Battery Slot

Skyworth box T1 power cord

Skyworth Box T1 Getting Started Manual
Skyworth Box T1 provides remote controllers, two AA batteries, power cords, and an introductory manual for product accessories. (Note: Xiaobian's evaluation is based on the evaluation model provided above. The actual accessories are subject to actual sales.) Among them, Skyworth Box T1 remote control uses a pure white plastic material design and old-fashioned remote control button design.

Skyworth box T1 massive real shot Mito Appreciation

Skyworth box T1 body design simple and elegant, pure white body is clear and clean, Skyworth box T1 remote control and the previous 12-key remote control design has changed a lot. To understand the Skyworth box T1, start with its shape first! Below, Xiao Bian brings a beautiful real shot of Skyworth box T1!













Smart TV/box information can focus on smart TV information network sofa butler (http://), China's influential TV box and smart TV website, providing information, communication, TV boxes, smart TVs, smart TV software, etc. Answering questions.

Steam Turbine Care

Service Scope: Steam turbine spare parts supply; steam turbine installation, inspection & overhaul, technological upgrading, turbine technology training, turbine low oil pressure renovation, turbine rotor shaft bend restoration, lower turbine`s vibration and noise, remove speed governing system abnormal volatility or load swing, solve turbine insufficient output, discontent load or other common/exceptional faults.


Contract to overhaul and all kinds of turbine`s remould, turbine dynamic balance and so on, for satisfying practical operation requirements.


Provide technical support and service for operation, inspection, maintenance, accident treatment and so on.


1. Steam Turbine Maintenance/Overhaul Service

Steam turbine normal overhaul, failure treatment; main body components repair, heat exchange tubes of cooler replacement and so on.


2. Technical guidance


Generating or Industrial driving turbine inspection, overhaul, upgrading and other items technical guidance.


3. Thermodynamic System Optimizing Services


For operating or planning projects or equipment, according to end users` actual CHP(or heat-work cooling) requirements, make cycle efficiency analysis, provide system optimizing service.


4. Speed Governing System Remould

Upgrade old hydraulic governing system to digital electro-hydraulic governing system, satisfy flexi-ble configuration all kinds of control strategy requirement.


5. Flow Passage Optimization and Modification


Total modification for steam turbine shall increase old turbine`s economic efficiency with advanced technology, service life also shall be extension.


6. Turbine Parameters Remold and Modification


Apply to processing or procedure transformation (or project site change) cause turbine operation parameters` change.


7. Uncontrolled extraction steam reconstruction


Consideration of turbine security and economic, open a hole for extraction steam normally in order to heat supply reformation.


8. Steam Turbine Engineering Service


Provide small & middle size steam turbine generator or industrial steam turbine complete set engineering, project design and project installation service.


9. Vibration Analysis and Rotor Dynamic Balance

24Hours Service for emergency vibration analysis and wide range rotor dynamic balance service at project site or back to factory.


10. Condensing (extraction condensing) type remodel to back pressure type


Condensing (extraction condensing) steam turbine remodel to Back Pressure Steam Turbine


11. Steam Turbine Vacuum System Upgrade


Condenser three-dimension design and upgrade, reduce heat-transfer temperature difference, increase steam exhaust vacuum degree, improve turbine economic efficiency. Water cooling remodel to air cooling.


12. Steam Turbine Enlargement Capacity Reconstruction


Reconstruct the turbine`s capacity which are caused by system or equipment changing.


13. Motor Speed Governing Variable-frequency Remould

Variable-frequency drive remould for pump systems of all kinds of industrial and mining enterprises.


14. Domestic Equipment Reconstruction


Domestic equipment reconstruction for imported turbine


15. Circulating Cooling Water System Optimization and Modification


Optimization and modification of operating circulating cooling water system, reduce operation energy consumption rate.


16. Waste Heat Steam Turbine Gland Seal System Upgrade


After upgrade, steam leakage ( effect gear box oil quality) shall be improved by the reason of waste heat parameters are not stable.


17. Spare Parts Marketing


Normal easily damaged parts warehouse, shorten delivery time.

Case 1


A fertilizer company has 2 sets of steam turbine, model are: CB6-3.43/1.27/0.294 and CB6-3.43/1.17/0.294. Because end user`s power load and steam consumption are changed, the turbines must be reconstructed according to steam parameters, flow change and guarantee high efficiency.


Remould Parameters: turbine max. inlet steam is 100t/h, when inlet steam is 97t/h and inlet pressure is 3.15MPa(g), its extraction steam is 62t/h extraction pressure is 1.51MPa(g), exhaust pressure is 0.21MPa(g), guarantee output is 5800KW (deviation±5% ).


Main job of remould and overhaul:


1. Casing was sent back to manufacture`s factory for rebuilding 2 valve seat hole, expand nozzle block steam passage.


2. Change nozzle block, take out guide blade carrier.


3. The original double row governing stage impeller and blade was changed to single row governing stage impeller and blade, add governing stage sheath, parts of rotor sleeve need to be changed and adjusted.


4. LP stage 3rd diaphragm steam passage inspection optimization.


5. Casing and rotor dismounting and assembling in factory with comprehensive inspection.


6. Rotor low speed dynamic balance test.


7. Governor static test in factory, overspeed test.


8. Dismount & assembly, overhaul at project site.


9. Clear incrustation for steam governing valve, nozzle and blade.


10. Gland seal inspection and replacement, gland sealing clearance adjustment, change the seal block which was severe wear, spring leaf which are damaged should be changed.


11. Every bearing repair and adjust.


12. HP & LP governing steam valve grinding, stroke adjustment.


13. Front bearing pedestal dismounting and inspection, patch oil leaking points.


14. Inspection and patching steam leaking of HP steam governing valve link rod.


15. Turbine mainbody troubleshooting.

After remolding is complete, the 2 turbine sets are running very well.


Case 2

There is a paper mill which has a set of steam turbine: B6-3.43/0.981. Due to processing consumption in workshop and load were changed, the end user request reset new back pressure and achieve the best efficiency within the shortest time.


Parameters reform to: when rated inlet flow: 55t/h, inlet pressure: 3.43±0.2MPa(a), exhaust pressure: 0.59MPa(a), steam rate guarantee value must be 11.65kg/(kw·h), output power must be 4700KW under rated working condition. The reconstruction project is a turnkey project, from preparing components to dismount heat material, equipment dismounting and installation, till to equipment commissioning successfully.


For reducing the work amount, keep casing and pipelines still, main jobs are following:


1. Change front & rear gland seal and diaphragm seal.


2. Change main shaft assembling (keep mail oil pump and coupling still).


3. Change HP nozzle block, HP guide blade carrier and original 2 stage diaphragm, add 3 stage diaphragm, 5 stage diaphragm adopts special design for satisfy the requirement.


4. Change the original 3 stage impeller and add another 3 stage impeller.


5. Steam governing valve link rod adjust inlet steam, check all butterfly valves matching conditions, improper ones should be changed.


6. Original rotor`s coupling, MOP shall be mounted in new rotor.


7. Rotor balance.


8. Change sylphon of governing system.


9. Change pressure transducer sleeve, adjust hydraulic servo-motor stroke.


10. Governor static test in factory.


11. Clear oil system.


The reconstructed steam turbine is B4.7-3.43/0.59, end user evaluates steam rate, vibration, exhaust temperature very strictly, but the reconstructed steam turbine is running very well and fully meet the design performance.



Steam Turbine Care,Steam Turbine Services

Shandong Qingneng Power Co., Ltd. , https://www.steamturbine.be